11 Best Of How To Install Paneling On Metal Studs HD Image Size. When installing metal panels it is vital to get your first panel squared. Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Putting Up the Panels For vertical installation start at one side of the wall and position the panel at least 12 inch off the floor. When installing metal panels it is vital to get your first panel squared. Raising the panel prevents rusting.
It will be slightly proud but as stated step chair molding is available to handle the difference.
Install Metal Panels or Shingles Align the first metal roofing panel so that it overlaps the edging by 12 to 34 of an inch and is square to the roof line. Cover the lower portion of the wall with 38 plywood then apply your 14 paneling over that. Start at the end of one wall and use square up. Rockler carries this type of fastener as well as flush mount drop in brackets.